Minimum production tolerances and maximum load capacity of Siegmund support- and foundation rails, combined with tables on connecting frames, enable the accurate to the millimeter construction of a 53 m long skywalk, weighing 70 tons.
The Siegmund image search for "Bridge Construction" resulted in 5 hits
Bridge Construction
Matthaeus Schmid, Baltringen (DE)
Bridge Construction
Matthaeus Schmid, Baltringen (DE)
Bridge Construction
Matthaeus Schmid, Baltringen (DE)
Bridge Construction
Matthaeus Schmid, Baltringen (DE)
Bridge Construction
Matthaeus Schmid, Baltringen (DE)
Please note:
Company holiday: 23.12.2024 - 06.01.2025. Last delivery day in 2024: 17.12.2024. Last collection day in 2024: 19.12.2024 (until noon).
From January 7th, 2025 we will be at your disposal again as usual.