Illustrations show production of diesel-hydraulic locomotives.
Plasma-nitrided tables are low-maintenance, thereby facilitating speedy retrofitting. Siegmund functional clamping devices also enable quick processing of low volume production.
A locomotive runs through several workstations during the production process at the Munich plant.
In this workstation the shell of the base frame is clamped, and additional components are tacked and welded. The floor panel installation also takes place here, due to the specifically developed rotation mechanism.
The 18 meters long base frame has a total weight of approx. 10 tons.
The Siegmund image search for "Locomotive Construction" resulted in 14 hits
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Voith Turbo, Kiel (DE)
Locomotive Construction
Siemens AG, Muenchen (DE)
Locomotive Construction
Siemens AG, Muenchen (DE)
Locomotive Construction
Siemens AG, Muenchen (DE)
Locomotive Construction
Siemens AG, Muenchen (DE)
Locomotive Construction
Siemens AG, Muenchen (DE)
Locomotive Construction
Siemens AG, Muenchen (DE)
Please note:
Company holiday: 23.12.2024 - 06.01.2025. Last delivery day in 2024: 17.12.2024. Last collection day in 2024: 19.12.2024 (until noon).
From January 7th, 2025 we will be at your disposal again as usual.